ArticlesPSA: Billings Totals from Timecards Not Calculating Correctly on Project Overview

Knowledge Article

PSA: Billings Totals from Timecards Not Calculating Correctly on Project Overview

Incorrect billing totals on the Project Overview page may result from the `Actuals Lock` checkbox being enabled in Custom Settings. This setting prevents the PSA Actuals Scheduled Job from running, which stops the system from updating totals with the latest timecard information. To resolve this, navigate to the Actuals Batch settings and uncheck the `Actuals Lock` checkbox. This action allows the scheduled job to run and calculate the billing totals correctly.